Turnkey
Projects
Concept to Commissioning of Power Plants involving either

Green
Field- Expansion Project or

Old
Plant Relocation.
These Power Plants Projects involve mapping customer specific needs,
working out firing system suitable for available fuel(s), Turbine selection,
preparations of front end engineering like Heat Mass Dig., Plant Layout,
Control scheme. Scope extends to Detailed Engineering, Vendor Sourcing,
Manufacturing Inspection plan, Project Scheduling, Erection &
Commissioning of power plants. All Documents shared with customer to train
them during project execution.
In case of Old plant relocation careful study of existing layout, analysis
of operation log sheets & residual life assessment of parts is carried
out to enable conclude necessary upgrade requirements before relocation.
- R&M :- Renovation & Modernization of existing power
plants
- Improvement based-: fuel change, capacity enhancement, efficiency
improvement.
- Solution based-: solving steam temperature problems, repeated
failures in particular area, removing operational limitations.
- Control & Instrumentation modernization.
Services
Sharp Consultants also provides its services in the following sectors:
- Engineering Studies
- Conduct project feasibility studies
- Engineering analysis for trouble-shooting
- Condition assessment & remaining life analysis for old Power
plants
- Solid Modeling of equipments, assemblies
- Engineering Assignments
- Design & detailing of individual equipment
- Large complex structural analysis using STAAD software
- High pressure piping analysis- using CAESAR software
- ASME design calculations documentation for pressure vessel
- IBR calculations for old boiler getting relocated
- Support Pillar for large Engineering Business Houses for their
peak load
- This involves complete design-drafting support for crashed
schedule projects,
- Deputation of our executive to customer plant locations for close
co-ordination
- Project Management
- Vendor selection & sourcing of material
- Execution follow-up for on schedule job completion
- Third party Inspection of power plant equipments, preparation of
Quality Plan-QAP
- Cost Data Bank
- We can provide lowest target price for power plant equipments to
our customers based on their intended use & project
specification.
- Boiler Parts Sourcing
- Membrane panel, inbed Evaporator Coils, Convention Bank, Headers.
- Other pressure parts including drums
- Deaerator, Blow down tanks
- LP, HP, Dosing systems.
- Efficient Steam-Water separating Drum Internals.
Advantages:-
Working with Sharp Consultants you are assured of following benefits coming
your way
- Technical
- Proven performance.
- Complete solution -all peripherals are covered in the package.
- Suitable for latest pollution norms
- Extended life by another 15-20 Years for old power plant after
upgrade
- Commercial
- Minimum Initial investment.
- Faster execution resulting in Early Revenue Recognition".
- Guaranteed output.
- Improved profitability.
Mode of operation
The Company studies all the minute details before offering you the best
suitable proposal with alternatives / suggestions for customer assessment
and selection. Company offers complete consultation & takes overall
responsibility to put the project through from concept to its commissioning.
Company guarantees the performance of the proposed equipment. We include
required spares based on field experience in our supplies. Though complete
responsibility lies with us we recommend our customers for direct buying
from vendors to avoid increased cost on account of double handling,
tax-duties.
Typical Project
Execution Steps:
Conceptualizing-
Where Design Basis, Operating Load Cases, C&I scheme, O&M
Requirement are frozen after understanding site setup- skilled-semiskilled
manpower, end application & its critical factor.
Detailed Engineering-
Which means Process Calculations-Boiler Block sizing, Bought-out &
Equipments sizing, Pipe Line sizing and generating a valve schedule,
Foundation data generation, Strength Calculations, Generating Manufacturing
Drawings.
Planning-
Project Schedule & interaction points with others, for bought out
items, Important Inspection points, Review requirements and its
schedule.
QAP-
Working out quality assurance plan for Raw material inspection,
Manufacturing in-stage and final inspection, bought-out items test-bed run
witness, review of documents.
Erection & Commissioning-
Decide erection sequence, identify parallel fronts and manpower
requirement.